Installation Manual

23
INSTALLATION INSTRUCTIONS
1. Fix the hook with tapping screw onto the
wall. (Refer to Fig.49-7)
2. Hang the indoor unit on the hook.
2. Location the hanging arm on the hanging
screw bolt. (Refer to Fig.49-10)
Prepare the mounting bolts on the unit.
(Refer to Fig.49-11)
3. Hang the unit on the hanging arm by
sliding backward. Securely tighten the
mounting bolts on both sides.
(Refer to Fig.49-12)
1. Remove the side board and the grille.
(Refer to Fig.49-9) (For 48000Btu/h and
60000Btu/h models, do not remove the
grille.)
Washer
Tapping screw
Hook
<6mm
Fig.49-7
Fig.49-8
Fig.49-9
Fig.49-10
Fig.49-12
Fig.49-11
Fig.49-13
4.4 Ceiling Installation
Hanging arm
Side board
Grille
Screw nut
Hanging
screw bolt
Hanging arm
20 25mm
Mounting bolt
(Max.40mm)
8-13mm
Washer
Hanging arm
Mounting bolt
Hanging
Screw bolt
D. Connecting point of
refrigerant pipe(D.gas side)
Drain point
E. Connecting point of
refrigerant pipe
35mm
1000mm
35mm
35mm
(E. Liquid side)
CAUTION
The figures aboe are based on model with
18000Btu/h as rated capacity, which may
differ from the unit you purchased.