Operating Instructions

4 Unroll
about
a foot of film
and
fit
the
square
hole
in
the
spool of film over
the
square
base on
the
supply
spindle.
(If
the
film
chamber
is off
the
mechanism
part,
unroll
about
two
and
one-half feet of film.)
5
Refer
to
the
illustration.
The
white line represents
the
path
the
film
must
follow.
6
Thread
the
film between
the
SPROCKET
and
the
upper
sprocket clamp.
Engage
the
film
perforations
with
the
sprocket
teeth;
then
close
the
clamp.
7 Follow
the
threading
guide line between
the
upper
guide
and
PRESSURE
PLATE,
so
that
the
proper
film
loop is formed.