User's Manual
Table Of Contents

Chapter 5 Equipment MDC-2000A Series
5-12 0093120007-01
5.4 Adjustment after Installation
Before setup, confirm the following points to operate properly the equipment
1. The ship’s power, to which the radar system is connected, should be the specified voltage.
2. No person should be present around the antenna and mast. The Display unit should bear the
placecard, describing the caution [Radar being adjusted, do not touch the Operation unit.]
After confirming the above items, be sure to perform the adjustments.
The adjustments after the installation are the following items in 3.3 Setting of Adjustment Items.
● BRG ADJ
● TX DELAY ADJ
● MBS
● AUTO TUNE ADJ
For the adjustments, refer to 3.3 Setting of Adjustment Items.
Work of flush-mount instsllation hole
Fixing holes for M4 screw (4pcs)
Unit: mm (inch)