Installation Guide
TP-6879 3/1522 Section 1 Installation
Engine start connection for other transfer
switches or a remote start/stop switch
Connect the engine start leads from the transfer switch
or remote start switch to terminals 3 and 4 on the
terminal block. See Figure 1-20. Route the engine start
leads through separate conduit from the AC power and
load leads.
tp6803
1. Generator Set Terminal Block. See the dimension drawings in Section 3 for location. Check the decal on the generator set for terminal
block connections.
2. Engine start leads 3 and 4. See the ATS manual for cable size specifications.
Generator Set ATS
(with engine
start contacts)
1
2
A
B
COM
PWR
3
4
TB3
Figure 1-20 Engine Start Connections with Transfer Switch Models RDT or RSB