Installation Guide

Table of Contents
TP-6879 3/15 Table of Contents 3
Safety Precautions and Instructions 5.........................................................
Introduction 9...............................................................................
Startup and Registration 9.....................................................
Service Assistance 10.........................................................................
Section 1 Installation 11......................................................................
1.1 Introduction 11...........................................................
1.2 Lifting 12................................................................
1.3 Generator Set Inspection 12...............................................
1.4 Location and Mounting 12.................................................
1.4.1 Mounting Area 12................................................
1.4.2 Exhaust Requirements 13.........................................
1.5 Dimension Drawings 13...................................................
1.6 Access the Air Intake Area 13..............................................
1.7 Fuel Requirements 14.....................................................
1.7.1 Fuel Supply 14...................................................
1.7.2 Fuel Pipe Size 14.................................................
1.7.3 Connecting the Fuel Supply 15.....................................
1.8 Fuel Conversion 16.......................................................
1.9 Electrical Connections 18..................................................
1.9.1 Grounding 19....................................................
1.9.2 Electrical Lead Entry 19...........................................
1.9.3 Field-Connection Terminal Block 19.................................
1.9.4 AC Power Supply 20..............................................
1.10 ATS and Accessory Connections 21........................................
1.10.1 Transfer Switch Connection 21.....................................
1.10.2 Communication Cable Specifications 23.............................
1.10.3 System Connections with Accessory Modules 24.....................
1.11 Battery 28...............................................................
1.12 Prestart Installation Check 29..............................................
1.13 Set the Exerciser 30......................................................
1.13.1 RDC2 Controller 30...............................................
1.13.2 DC2 Controller 30................................................
1.13.3 Loaded Exercise 30...............................................
1.14 Operation Test 30........................................................
1.15 OnCue Plus Generator Management System 31..............................
Section 2 Accessories 33.....................................................................
2.1 Introduction 33...........................................................
2.2 Connect Optional Programmable Interface Module (PIM) 33...................
2.3 Load Control Module (LCM) 34.............................................
2.4 Load Shed Kit 35.........................................................
2.4.1 Special Equipment 35.............................................
2.5 Carburetor Heater 36.....................................................
Section 3 Drawings and Diagrams 37..........................................................
Appendix A Abbreviations 43...................................................................