Installation Guide

Roughing-In - Required Components
For best results, follow the suggested installation sequence below. Specific, detailed instructions for each
installation step are located on the remaining pages of this installation guide.
NOTE: The illustration above shows a typical installation with the preferred installation locations for the
user interface and control amplifier.
Suggested Installation Sequence
Determine the installation location for the bath, user interface, and control amplifier.
NOTICE: Use wood stud or concrete framing. Metal framing may adversely affect the vibracoustic quality
of the product.
Determine the location for the access panel (required) for servicing the control amplifier.
Route all plumbing supply lines for the bath.
Install the bath and drain.
Route the transducer cables to the area chosen for the control amplifier.
If equipped, route the optional chromatherapy cable to the area chosen for the control amplifier.
Route the user interface cable from the control amplifier area to the user interface location.
Install an electrical outlet within 24 (610 mm) of the area chosen for the control amplifier.
Install the control amplifier.
Connect the transducer, user interface, optional auxiliary device, and chromatherapy cables (if
equipped) to the control amplifier.
Finish the walls, and install the required access panel for the control amplifier.
User Interface
10"
(254 mm)
24" (610 mm)
Chromatherapy
Cable (If
Equipped)
Access
Panel
Control
Amplifier
Drain
Overflow
Transducer
Cables
1188012-2-C 4 Kohler Co.