Installation Guide

5. Route the Piping
Bath Spout as Primary Outlet
Install piping and elbows to the bath and showerhead installation
locations. Use thread sealant on all threaded connections.
Secure the piping to the framing.
Solder all needed connections.
Temporarily install 1/2” pipe nipples to the elbows so they will
extend at least 2” (51 mm) beyond the finished wall.
Install caps to both pipe nipples.
Proceed to the “Reassemble the Valve” section.
Bath Outlet
Hot Supply
Cold Supply
1/2" Pipe Nipple
Showerhead Outlet
1/2" Pipe Nipple
Kohler Co. 11 1128093-2-E