Installation Guide

Important Product Information (cont.)
Connections and Service Access
NOTICE: Provide unrestricted service access to the pump and heater. Provide unrestricted service access
to the pump, inline heater, adjustable feet, and control box. You must construct an access panel to provide
sufficient clearance for servicing the pump, inline heater, and control box. The access panel must be located
immediately next to the pump and inline heater. Study the roughing-in information.
Electrical Requirements
The installation must have two Class A Ground-Fault Circuit-Interrupters (GFCI’s)*. The GFCI protects
against line-to-ground shock hazard. Use a 208-240 V, 20 A, 50/60 Hz dedicated service for the pump
controls. Use a separate 208-240 V, 20 A, 50/60 Hz dedicated service for the heater.
An equipment grounding terminal is provided in the field wiring compartment. To reduce the risk of
electrical shock, this terminal must be connected to the grounding means provided in the electrical supply
panel with a conductor equivalent in size to the circuit conductors supplying this equipment.
Install this unit in accordance with the Canadian Electric code, Part I.
*Outside North America, this device may be known as a Residual Current Device (RCD).
Tools and Materials
Introduction
Please read these instructions carefully to familiarize yourself with the required tools, materials, and
installation sequences. Follow the sections that pertain to your particular installation. This will help you
avoid costly mistakes. In addition to proper installation, read all operating and safety instructions.
All information in this manual is based upon the latest product information available at the time of
publication. At Kohler Co., we constantly strive to improve the quality of our products; we therefore reserve
the right to make changes in product characteristics, packaging, or availability at any time without notice.
Before You Begin
Your bath is designed for deck-mount, under-mount, or alcove installations.
You must install the bath onto an adequately supported, level subfloor.
Plus:
• Conventional Woodworking
Tools and Materials
• Drop Cloth
• 2x4s or 2x6s
Silicone Sealant4' (1.2 m) Level
Kohler Co. 3 1019731-2-E