Installation Guide

Before You Begin (cont.)
Unpack and inspect the bath for damage. Return the bath to the carton until installation.
Read these instructions and determine the locations for all required components before beginning
installation.
Provide access to the control amplifier and control board connections for future servicing.
This bath is designed for three-side alcove installation.
The control amplifier may be installed remotely, and includes a 25’ (7.6 m) cable.
A qualified electrician should install a 120 V, 15 A GFCI or RCD electrical outlet within the stud
framing and within 24 (610 mm) of the control amplifier. Other included bath components are
powered through connections with the control amplifier.
Use conduit to route electrical wires from the circuit breaker.
Choose the location for a battery operated auxiliary audio device, if used. Do not locate AC
powered devices within reach of the bath.
Carefully plan moving the bath into the installation area. This bath will not easily fit through
doorways.
Install this bath on a level subfloor. Shims may be needed if the subfloor is uneven.
This bath conforms to CSA B45.5/IAPMO Z124. All dimensions are nominal.
Kohler Co. 3 1188012-2-D