Installation Guide

Roughing-In - Required Components
For best results, follow the installation sequence below. Detailed instructions are found on the following
pages of this guide.
Recommended Installation Sequence
Determine the locations for the bath components. Refer to the illustration for preferred locations.
NOTICE: Use wood studs to construct the bath frame. Metal framing may adversely affect the
vibracoustic quality of the product.
Plan the required access panel location for servicing the control amplifier.
Construct the alcove framing for the bath.
Route plumbing supply lines.
Install the bath and drain.
Route the transducer wires to the control amplifier location.
If equipped, route the chromatherapy cable to the control amplifier location.
Route the user interface cable from the control amplifier location to the user interface location.
Install the control amplifier.
Finish the walls. Install the access panel for the control amplifier.
Connect the user interface cable to the user interface, and install the interface.
Test the functionality of all bath components. Refer to the Homeowners Guide for operation.
User Interface
10"
(254 mm)
24" (610 mm)
Chromatherapy
Cable (Some
Models)
Access
Panel
Control
Amplifier
Drain
Overflow
Transducer
Cables
1188012-2-D 4 Kohler Co.