Installation Guide

Tools and Materials
Before You Begin
Observe all local plumbing and building codes.
Unpack and inspect the apron for damage. Return the apron to the carton until you are ready to
install it.
The apron must be installed before the finished floor and wall materials are installed.
This apron system is designed to have the finished wall materials [1-1/2 (3.8 cm) maximum
thickness] go over the apron columns. It is also designed to have the finished floor materials [2 (5.1
cm) maximum thickness] butt up against the channel.
The apron can be used as an access to the whirlpool pump and controls, when applicable. However,
additional access may make servicing of the pump and controls easier.
NOTE: Before installing the apron, fill the bath/whirlpool with water and check the drain system for
leaks. If applicable, test the whirlpool system for leaks and proper operation.
Kohler Co. reserves the right to make revisions in the design of products without notice, as specified
in the Price Book.
Pencil
Square
Plus:
• Construction Adhesive
• Conventional Woodworkng Installation Tools and Materials
• Support Structure Materials (2x2s or 2x4s)
• Shimming Material (as needed)
Tape
Measure
Phillips
Screwdriver
Flat-Blade
Screwdriver
Safety
Glasses
Drill/
Drill Bits
1018323-2-C 2 Kohler Co.