Installation Guide

5. Complete the Installation Freestanding
Apply lubricant (supplied) to the O-rings on the coupling
assemblies.
Insert the arms of the bath filler onto the coupling assemblies.
Ensure the arms are flush against the top of the riser tubes.
Secure the arms to the coupling assemblies with the large
setscrews.
Slide the tee assembly up to cover the seam between the arms
and the top of the riser tubes.
Insert the fastener rod to the center of the tee assembly, as shown.
Secure the tee assembly, with two small setscrews, below the
center of the tee assembly.
Remove the protective wrap from the riser tubes.
Secure the brackets at this location with small setscrews.
Proceed to the Install the Handshower - All Installations section.
Bracket
Arms
Riser Tube
Fastener Support
Coupling Assembly
Coupling Assembly
Small Setscrew
Small Setscrew
Small Setscrew
Large Setscrew
1054455-2-E 10 Kohler Co.