Full Product Manual
TP-7092 4/23 19
• Digital voltage regulation: ±0.5% RMS no-load to full-load
• Automatic start with programmed cranking cycle
• Programmable exerciser can be set to start automatically on any future day and time, and run every week or every two
weeks
• Exercise modes
o Unloaded cycle exercise with complete system diagnostics
o Unloaded full-speed exercise
o Loaded full-speed exercise (Model RXT ATS required)
• Front-access mini USB connector for Kohler
®
SiteTech™ connection
• Integral Ethernet connector for Kohler
®
OnCue
®
Plus Generator Management System
• Built-in battery charger
• Remote two-wire start/stop capability for connection of Model RDT or other transfer switches
• Diagnostic messages
o Displays diagnostic messages for the engine, generator, Model RXT transfer switch, programmable interface
module (PIM), and load management device
o Over 70 diagnostic messages can be displayed
• Maintenance reminders
• System settings
o System voltage, frequency, and phase
o Voltage adjustment
o Measurement system, English or metric
• ATS status (Model RXT ATS required)
o Source availability
o ATS position (normal/utility or emergency/generator)
o Source voltage and frequency
• ATS control (Model RXT ATS required)
o Source voltage and frequency settings
o Engine start time delay
o Transfer time delays
o Voltage calibration
o Fixed pickup and dropout settings
• Programmable Interface Module (PIM) status displays
o Input status (active/inactive)
o Output status (active/inactive)
• Load control menus
o Load status
o Test function