Installation Guide

5. Install the Valve
3/4'' Union
Shut-Off Valve
Hot
Cold
Board Mount Bracket Mount
Route 3/4 (1" PEX) dedicated water supply lines. Use unions to install removable pipe segments to the valve inlets to
allow access for periodic cleaning of the inlet screens.
Install shut-o valves in the supply lines before the valve.
Hold the valve up to the installation location. Verify t and mark the hole locations.
Predrill the holes.
Secure the valve with the washers and screws. Do not overtighten!
IMPORTANT! When routing piping, the number marked at each valve outlet must correspond to the appropriate shower
ing for preprogrammed or custom showering experiences to function properly. Refer to the Homeowners Guide for
more information.
Route the piping from the valve outlets to the appropriate shower ing following the recommended pipe ing sizes
listed.
Connect the hot and cold supply lines to the appropriate valve inlets. Hot is red and marked with “HOT,” cold is blue
and marked with “COLD.”
Secure all piping to the framing.
1430528-2-A
12 Kohler Co.