Installation Guide

8. Install the Tubing
Rough-Deck Installation Only
Thread the collars down the valve bodies so the exposed valve
height is correct for your installation.
Measure gap X as shown above.
Cut a copper tube to a length of X plus 1 (25 mm).
Insert the copper tube into the supply tube and tee.
Valve Height
2-1/16"
(52 mm) Max
1-13/16"
(46 mm) Min
Finished
Material
Thickness
Supply
Tube
Sleeve
Collar
X +
1" (25 mm)
X
Kohler Co. 11 1275145-2-A