Installation Guide

7. Complete Installation on Rough Deck
Reset the Valve Body Height
Adjust the threaded collars until the dimension from the top of
the sleeve to the top of the rough deck equals the clearance
requirement calculated earlier.
Solder the Connections
Tighten the mounting nuts on each valve body under the deck.
Solder the copper tubes to the valve bodies, tee and spout supply
tube.
Make sure that the cold supply is on the right side.
Solder the hot and cold water supply tubes to the valve body
inlets.
Top of
Sleeve
Tile
Thickness
Threaded
Collar
Rough
Deck
Pre-Determined
Clearance
Requirement
Hot
Supply
Cold
Supply
Solder
Spout
Supply
Tube
Copper
Tube
Rough
Deck
Valve
Body
Mounting
Nut
Kohler Co. 11 113969-2-AC