Installation Guide
Finish the walls and deck, and install the required access panel for the control amplier.
Connect the user interface cable to the user interface, and install the user interface.
Plug the control amplier into the electrical outlet.
Test the functionality of all bath components. Refer to the “Homeowners Guide” for operation.
1297608-2-E
6 Kohler Co.