Installation Manual

Tools and Materials
Before You Begin
CAUTION: Risk of property damage. Before finishing the
wall, make sure the supply lines are connected to the mixer
valve with the cold line plumbed on the left and the hot line
plumbed on the right.
IMPORTANT! Unless otherwise indicated, the illustrations in this
document show installation for a handle located to the right of the
spout. The valve is designed for handle installation on the right.
Special steps will need to be performed to position the handle to the
left of the valve.
NOTICE: For exterior wall installations, be sure proper wall
insulation is installed to prevent frozen pipes.
NOTE: For service parts information, visit your product page at
www.kohler.com/serviceparts.
Observe all local plumbing and building codes.
Shut off the water supply.
Carefully inspect supply tubing for any sign of damage.
The supplied plaster guard will also be used to assemble the
valve. The supplied spout tool will also be used for alignment of
the spout escutcheon.
2x4 Lumber
#10 Wood Screws
Plumbers Putty
Solder
Propane Torch
Tube Cutter
1-3/16" and 2-3/16"
Hole Saw
5/64"
3/32"
1095311-2-J 2 Kohler Co.