Installation Guide
1013610-2-A
3
Kohler Co.
2x6
Minimum
Brace
Notch studs 1-1/2” (3.8cm) to
provide support for headers
(104.3cm)
C
L
(39.2cm)
(39.2cm)
To top of bracket
7-3/16” (18.3cm)
7-3/16”
(18.3cm)
40-1/4” (102.2cm)
15-7/16”
15-7/16”
41-1/16”
1. Wall Preparation for Standalone Installation
Brace Installation
All Installations
2. Mounting Bracket Installation and Floor Preparation