Installation Guide

1. Begin Installation - Floor Supplies
CAUTION: Risk of product damage. Remove the plaster guards,
valve units, and aspirator before applying heat to the yoke.
Determine the location of the support framing for the yoke,
spout, and the showerhead.
Install the support framing.
The yoke has two union joints that can be used with either 1/2
pipe or copper tubing.
Connect the hot and cold supplies to the union joints. They
should be 2-1/4 (5.7 cm) minimum and 3 (7.6 cm) maximum
from the finished wall.
Reinstall the plaster guards, valve units, and aspirator that were
removed before soldering.
48" (122 cm) to Floor
72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
72" (182.9 cm) –
78" (198.1 cm) to
Floor (Typical)
Bath/Shower Installation
Shower Installation
4" (10.2 cm)
8" (20.3 cm)
Valve Units
1/2" Pipe or
Copper Tubing
Plaster
Guard
3" (7.6 cm)
Max
2-1/4" (5.7 cm)
Min
Union
Joints
Finished
Wall
Yoke
Kohler Co. 3 117124-2-A