Installation Guide

5
Kohler Co.
1010448-2-D
VALVES
S Remove the dish washer (if required),
washer and nut from the end bodies.
S Apply a bead of plumbers putty around
the underside of the escutcheons.
S Insert the end bodies into the
mounting holes from the top of the
bidet. Ensure the end body marked
cold is installed in the right-hand hole
(as viewed from the front of the bidet).
Escutcheon
Apply Plumbers
Putty
End Body
Dish Washer
(When Required)
Washer
Nut
S Install the dish washer (if required),
washer and nut to the bottom of the
end bodies.
S Align the end bodies so that the
copper tubing faces to the outside.
S Wrench-tighten the nuts.
S Remove any excess plumbers putty.
Nut
Washer
Dish Washer
S Thread the two short metal hoses to
the end body outlets. Tighten the
hoses securely.
Short Metal
Hose
End Body
End Body
Outlet
O-Ring
Dish Washer
TRANSFER VALVE/VACUUM
BREAKER
S Slide the nut and compression sleeve
on the adapter.
Compression Sleeve
Nut
Adapter