Installation Guide

3Kohler Co., Kohler, WI
113319-2-EA(-)
TOWEL SHELF AND GRAB BAR INSTALLATION
A. K-16155 TOWEL SHELF
1. Loosen the setscrew at the bottom of each shelf support.
Then remove the brackets from inside the shelf
supports.
NOTE: Use care to avoid scratching the product
finish.
2. Secure the three shelf sections to the shelf supports
(large section on top; small section on bottom) using the
hex screws provided. Tighten securely.
3. Refer to the roughing-in information on Page 2. Then
mount the brackets to the wall in the desired location. Be
sure to mount the brackets plumb.
4. Set the shelf assembly over the brackets, and securely
tighten the setscrews at the bottom of each shelf
support. Do not overtighten.
Fig. #2
Setscrew
Shelf Assembly
Hex Screw
Bracket
Shelf
Support
SITE PREPARATION – WALL PLATES
A. MARK CENTER POINT LOCATIONS
NOTE: For K-16145 Mirror, do not drill mounting holes
for second support plate until actual product is
measured.
1. Mark the center points of the accessory to be installed.
2. For multiple-post accessories, provide the required
distance between center points. See Fig. #1 . Use a
level to ensure that all center points are level.
Fig. #3
Level
Center Point
Single-Post Accessories
Center-to-Center Points
Multiple-Post Accessory
B. MARK PILOT HOLE LOCATIONS
1. Mark the pilot hole locations vertically 9/16” above and
below the center point or center points.
2. Vertically line up holes on the wall plate. Make sure the
larger hole is on the bottom.
Fig. #4
1-1/8” D.
9/16” R.
Holes
Wall Bracket
Wall Plate Hole Locations