Installation Guide

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Position the template on the countertop to ensure clearance
between the front and back countertop edges.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Cut-out
Line
Outside
Edge of
Lavatory
Countertop
Countertop
Backsplash
Template
1052864-2-B 4 Kohler Co.