Installation Guide

1. Preparation
Install the water supplies and drain piping according to the
roughing-in information. Install the supply stops so the handles will
not touch the pedestal when fully open.
Install sufficient backing behind the finished wall to provide a secure
material for the anchoring devices.
Use lag bolts (not provided) to install the hanger, spring clips, and
angle bracket to the wall according to the roughing-in information.
Make sure the hanger is level, and is secured to the backing material
behind the finished wall. Also ensure that the spring clips are
between the hanger and the finished wall before tightening.
Carefully lift the lavatory into place on the hanger, and level. You
may need to raise or lower the hanger so the lavatory contacts the
wall evenly.
NOTE: The lavatory must be supported by the hanger.
Locate the two lavatory anchoring holes, and mark the hole
locations on the finished wall.
Carefully remove the lavatory from the area.