Installation Guide

1007275-2-A
2 Kohler Co., Kohler, WI U.S.A.
TOOLS AND MATERIALS
REQUIRED
Level
Drill with assorted bits
9/16” wrench
Tape measure
Framing square
Channel lock pliers
INSTALLATION
Rough-in the supplies and the drain
piping.
NOTE: The supply stop handles cannot
extend more than 3” (7.6cm) from the
finish wall when in the open position.
Install sufficient backing behind the
finish wall to provide a secure
material for the anchoring devices.
Apply two self-adhesive gaskets
(provided) to each of the three
ridges in the bottom recess of the
lavatory.
Gaskets
Ridge
BOTTOM VIEW
OF LAVATORY
Gaskets
Gaskets
Ridge
Mark the centerline on the floor.
Position the pedestal on the floor
centerline.
Carefully set the lavatory on the
pedestal.
Move the pedestal as required to
ensure proper fit in the desired
location.
Level the lavatory. Add more
self-adhesive gaskets as needed to
level the lavatory.
NOTE: The lavatory must be
supported by the pedestal.
Check the lavatory placement.
Mark the center of each anchoring
hole on the wall, and mark the floor
through the hole in the pedestal
bottom.
Carefully remove the lavatory from
the pedestal. Then move the
pedestal from the area.
Mark Floor
Here
Pedestal
Center of
Anchoring
Holes
Finish
Wall