Installation Guide

6. Install the Bath
NOTICE: Do not lift the bath by the piping or blower, or use the piping or blower for structural support
of the bath. To avoid damage to the bath, lift by the rim at the sides of the bath.
Apply a generous amount of silicone sealant to the support blocks on the base of the shroud.
Apply sealant to both sides of the gaskets on the drain and overflow assembly.
NOTE: To provide access for securing the faucet connections, temporarily position block spacers at the
corners between the shroud and the bath rim. Position the blocks to avoid damaging the alignment guides
located under the bath rim.
With help, carefully lift the bath into place over the shroud and onto the block spacers.
Secure all faucet connections and fittings.
For USA and Mexico: Plug the blower power cord into the electrical outlet installed inside the
shroud.
Carefully remove the blocks and make sure the bath rim engages the top of the shroud on all sides.
Install the drain flange and overflow cover according to the drain instructions.
Close the bath drain. Fill the bath to the overflow, and check for leaks.
If desired, apply a thin, continuous bead of clear or color-matched silicone sealant to the seam
between the bath and the finished floor.
Test Run the Bath
Check all electrical connections and make sure the electrical power to the bath is on.
Fill the bath to a level at least 4 (102 mm) above the top of the highest airjet.
Operate the bath for 5 minutes and test the airjets.
For additional information on bath operation, see the Operating Instructions section.
Apply silicone
sealant.
Temporary
Blocks
Alignment
Guide
Kohler Co. 9 1237791-2-B