Cabinet Installation Sheet

1. Prepare the Site
NOTICE: If the K-2607 bridge cabinet will also be installed, extend
the backing material a minimum of 12 (305 mm) beyond the width
of the vanity on the side where the bridge will be installed.
NOTICE: To properly secure the vanity, the top of the required 2x6
backing material must be 32-1/2 (826 mm) from the finished floor.
Measure and mark 32-1/2 (826 mm) up from the finished floor.
This will be the height from the finished floor to the top of the
2x6 backing material.
Ensure there are no obstructions in the wall (such as wiring or
plumbing) from the marked height down to the floor. If there are
obstructions, select another area to install the vanity.
NOTICE: Extend the backing material beyond the width of the
vanity to the nearest stud to ensure proper support for the vanity.
Front-notch the studs 1-1/2 (38 mm) to ensure the 2x6 backing
material is flush against the studs.
Secure the 2x6 backing material to the studs with framing nails.
Rough-in the water supply and drain lines into the rough-in
plumbing area of the vanity.
NOTICE: The finished wall must be straight and plumb to ensure
proper support of the vanity and alignment of the sink and door.
2x6
Backing
Material
32-1/2" (826 mm)
Kohler Co. 3 1267640-2-A