Installation Guide

1. Install the Power Cord
NOTE: The power cord may be routed through the wall or
externally on the face of the wall.
If the finished wall has not been installed, route the power cord if
the cord will be routed through the wall.
If the finished wall is installed, drill a 3/8 (10 mm) hole in the
wall behind the toilet location for the power cord.
If the power cord is routed through the wall, route the power
cord to the docking station location from the toilet end.
Power
Cord
4"
(102 mm)
1197249-2-A 6 Kohler Co.