Installation Guide

Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don’t
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.
Before You Begin
CAUTION: Risk of personal injury or product damage. Handle
with care. Vitreous china can break or chip if the bolts and nuts
are overtightened, or if the product is handled carelessly.
Observe all local plumbing and building codes.
Carefully inspect the new bidet for damage.
The bidet must be installed with 3/8 hot and cold shut-off valves.
Refer to the roughing-in book for dimensional information.
Site preparation may require additional tools and hardware.
1. Preparation
Turn the water supply off.
Install the hot and cold water supplies, shut-off valves, and trap
outlet as necessary to conform to roughing-in dimensions.
1020408–2–B 2 Kohler Co.