Installation Guide

2. Prepare the Site
NOTE: This section continues the installation described in the
steam generator installation instructions. Refer to the steam
generator installation instructions for more information, if needed.
NOTE: If two steam heads are used, there must be at least 12-1/2
(318 mm) between the center of each hole. The steam heads do not
need to be located on the same wall. Two steam heads can be
mounted on different walls to improve steam distribution.
Install the finished wall.
Drill or cut a 2-1/2 (64 mm) hole centered around the elbow in
the wall.
Mark the temporary pipe nipple at the finished wall surface.
Remove the temporary pipe nipple from the elbow.
Finished
Wall
1/2" NPT
Elbow
2-1/2"
(64 mm)
Mark the temporary nipple
at the finished wall.
1235393-2-C 6 Kohler Co.