Installation Guide

6. Install the Bath
To provide access for securing the connections, temporarily position block spacers on opposing ends
between the shroud and the bath rim. Position the blocks to avoid damaging the alignment guides
located under the bath rim.
With help, carefully lift the bath into place over the shroud and onto the temporary blocks.
For -2MW Music Models: Refer to the installation instructions included with the amplifier for
wiring and installation details, and make the final electrical connections.
Secure all valve connections and fittings.
Plug the power cord into the installed outlet.
Carefully remove the blocks and make sure the bath rim engages the top of the shroud on all sides.
Ensure all alignment guides are inside the shroud; there should be no gap between the bath and the
shroud.
Install the drain flange and overflow cover according to the drain instructions.
Install the faucet trim according to the trim instructions.
Close the bath drain. Fill the bath to the overflow, and check for leaks.
If desired, apply a thin, continuous bead of clear or color-matched silicone sealant to the seam
between the bath and the finished floor.
Test Run the Bath
Check all electrical connections and make sure the electrical power to the bath is on.
Operate the user keypad to test the temperature settings.
For additional information on bath operation, refer to the Operating Instructions section.
Operating Instructions
IMPORTANT SAFETY INSTRUCTIONS
Temporary
Blocks
Alignment
Guides
Kohler Co. 9 1237788-2-E