Installation Guide

8. Assemble and Position the Wall Jambs
NOTE: The flexible fin of the seal is on the inside of the wall jambs.
NOTE: The wall jambs are longer than the seals.
Starting at the top, press a seal onto each wall jamb so that there is a left-side assembly and a
right-side assembly as shown.
Position the wall jamb assemblies over the threshold so the flexible fin is on the inside of shower. If
needed, snip the corners of the metal to fit the corner radius of the shower wall.
Use a level to plumb the wall jambs and mark the locations on the wall.
Use masking tape to temporarily secure the upper part of the wall jambs in place. Do not secure
with the adhesive on the back of the seal at this time.
Right Left
Fin
Fin
Kohler Co. 11 1380408-2-B