Installation Guide

1018154-2-B
Kohler Co.
6
1/8”
(3mm)
Stopper
Jam
Nut
4. Install Drain Stopper
- Insert the drain stopper into the drain.
- The drain stopper should have a 1/8” (3mm) clearance between the
bottom of the threaded rod and the floor of the drain elbow.
- If adjustment is required, remove the stopper assembly from the
drain and loosen the jam nut below the stopper. Turn the jam nut
counterclockwise to raise the stopper or clockwise to lower the
stopper.
- Tighten the nut.