Installation Guide

Top View
Shallow
Channel
Deep
Channel
Corner
Joints
Construction
Adhesive
Construction
Adhesive
Shims
Shims
Edge Trim
Outside Corner Joint
Edge Trim with Return
54" (1372 mm)
(not shown)
40"
(1016 mm)
36"
(914 mm)
24"
(610 mm)
Hook
Shower Barres
Handrail Shelf
7" (178 mm)
14" (356 mm)
21" (533 mm)
Floating Shelf
Shim
Seam
Joint
Top View
Top View
Back Wall with Joints
Shallow
Channel
Sealant
Deep Channel
Corner
Joint
Seam
Joint
9/16"
(14 mm)
Side View
Sanding Block
Back Side
Outside
Corner
Joint
Edge Trim
with Return
Edge
Trim
KOHLER® Limited Warranty — Choreograph™ Walls and Accessories
Kohler Co. warrants all Choreograph products (including Choreograph accessories) to be free of defects in
material and workmanship during normal residential use for ten (10) years from the date of sale. If a Choreograph
product or accessory is used commercially or is installed outside of the United States of America, Canada or Mexico,
Kohler Co. warrants the Choreograph product or accessory to be free of defects in material and workmanship
during normal use for three (3) years from the date of sale.
If Kohler Co’s. inspection of your Choreograph product or accessory discloses a defect in material or workmanship
within the applicable period of coverage stated above, Kohler Co. will, at its election, repair, replace or make
appropriate adjustment. Kohler Co. is not responsible for labor charges, installation, or other incidental or
consequential costs. In no event shall the liability of Kohler Co. exceed the purchase price of the Choreograph
product or accessory. Damages due to improper handling, installation or maintenance are not considered
manufacturing defects and are not covered by this warranty. This warranty is valid for the original, consumer
purchaser only. Proof of purchase (original sales receipt) must be provided to Kohler Co. with all warranty claims.
To obtain warranty service, contact Kohler Co., either through your plumbing contractor, home center, wholesaler,
dealer, or E-tailer, or by calling or writing Kohler Co., Attn.: Customer Care Center, 444 Highland Drive, Kohler,
Wisconsin 53044, 1-800-4KOHLER (1-800-456-4537) from within the USA and Canada, and 001-800-456-4537 from
within Mexico, or visit www.kohler.com within the USA, www.ca.kohler.com from within Canada, or www.
mx.kohler.com in Mexico.
TO THE EXTENT PERMITTED BY LAW, ALL IMPLIED WARRANTIES INCLUDING THOSE OF
MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE HEREBY DISCLAIMED.
KOHLER CO. AND SELLER HEREBY DISCLAIM ANY LIABILITY FOR SPECIAL, INCIDENTAL, OR
CONSEQUENTIAL DAMAGES. Some states/provinces do not allow limitations on how long an implied warranty
lasts, or the exclusion or limitation of special, incidental or consequential damages, so these limitations and
exclusions may not apply to you. This warranty gives you specific legal rights. You may have other rights which
vary from state/province to state/province.
This is the exclusive written warranty for Kohler Co.
Troubleshooting
Symptom Recommended Action
1. A panel is not correctly adhering to the wall or
ceiling.
A. There may be vapor lock. Pull the panel out away from the wall to allow vapor to escape and press back into place.
B. Is the installation over tile? The tile should have been roughed up with sandpaper to allow a better surface for the
adhesive to grip. Remove the panel, rough up the tile, apply additional adhesive, and reinstall the panel.
C. Were the wall and panel surfaces cleaned before adhesive was applied? Remove the panel and clean the surfaces.
Apply additional adhesive. Reinstall the panel.
IMPORTANT! It is critical the walls and panels
are clean for a strong bond to be created by the
adhesive.
Clean the back of the panels with denatured
alcohol.
On the edges of each panel, remove excess
material and smooth any rough edges using a
sanding block.
When wall panels fit into the corner joints, sand
the cut edges for a smooth fit.
Dry fit the corner and seam joints to the back
wall panel if they are being installed. (See step
14 for correct orientation.)
Dry fit the back and sidewall panels to confirm
fit. Adjust as needed.
Remove the wall panels and joints.
Installations Using Corner Joint(s):
Measure the height of the back wall panel.
Cut the corner joint to the height of the back wall
panel.
Apply color matched silicone sealant in the
deep channel on the corner joint. Apply enough
sealant to fill 1/2 of the channel.
Installations Using Corner Joint(s):
Install the deep channel of the corner joint on the
side of the back wall panel.
Repeat for the second joint if needed.
TIP: To remove excess sealant, spray denatured
alcohol on the area to be cleaned and onto your
finger. The denatured alcohol will help make the
removal of the sealant easier.
NOTE: Use silicone adhesive if the panels are
being installed over tile. Use bath and shower
construction adhesive for other applications.
Apply construction adhesive or silicone adhesive
to the back wall panel in a circular pattern.
The beads of adhesive should be 5” (127 mm) to
7” (178 mm) apart.
Apply a bead of construction adhesive along the
top edge of the back wall panel 3/4” (19 mm)
from the edge.
Move the back wall panel into place at a slight
angle.
Push the panel against the rough wall. Press
firmly and evenly across the entire wall. The
panel should contact the rough wall along the
entire area.
TIP: When removing excess silicone sealant,
spray denatured alcohol on the area with excess
sealant and your finger.
Remove the excess sealant with your finger.
Push firmly on all surfaces of the back wall panel
for full adhesion.
NOTE: Bracing may be needed to hold the panel
in place depending on the wall material and
adhesive being used.
When installed over tile, use a temporary brace
to secure each wall panel in place for 48 hours to
allow full adhesion.
If corner joints are installed, apply color matched
silicone sealant in the shallow channel. Apply
enough sealant to fill 1/2 of the channel.
NOTE: Use silicone adhesive if the panels are
being installed over tile. Use bath and shower
construction adhesive for other applications.
Apply bath and shower construction adhesive
to the side wall panel (bottom panel if there are
two panels) in a circular pattern. The beads of
sealant should be 5” (127 mm) to 7” (178 mm)
apart.
Press the side wall panel (bottom panel if there
are two panels) to the joints, then push the panel
firmly against the rough wall.
NOTE: Bracing may be needed to hold the panel
in place depending on the wall material and
adhesive being used.
When installed over tile, use a temporary brace
to secure each wall panel in place for 48 hours to
allow full adhesion.
Installations With Horizontal Seam Joint(s):
If a seam joint will be installed with a corner
joint, allow enough length for the seam joint to
extend into the corner joint channel.
Cut the seam joint to the required length.
Trim the end of seam joint where it will meet the
corner joint as shown.
NOTE: To trim the seam joint, a small rotary
tool with a cutting wheel is recommended.
Installations With Vertical Seam Joint(s):
Apply color-matched silicone sealant to the
channel on the wall side of the seam joint.
Install the seam joint to the installed wall panel.
Apply color matched silicone sealant to the
second channel of the seam joint when you are
ready to install the locker unit or a second wall
panel.
Installations With Horizontal Seam Joint(s):
Apply color matched silicone sealant to the
channel on the wall side of the seam joint.
Install the seam joint to the installed wall panel.
Install the additional wall panels following the
same steps.
Repeat steps 19 through 24 with the second
side of the enclosure
If installing edge trim on the outside edge of the
wall panel(s), measure the panel height and cut
the edge trim to fit.
Apply color matched silicone sealant to the edge
trim channel.
Install the edge trim to the outside edge of the
wall panel(s).
IMPORTANT: For better adhesion success,
allow the panels to cure 24 to 48 hours before
performing the final steps. Sealing the top and
bottom will restrict air flow, resulting in longer
curing time.
IMPORTANT! Brace the wall panels while
the adhesive is curing to stop the panels from
bowing outward.
Apply sealant to the top seam where the panels
meet the rough wall.
Apply sealant to the bottom seams where the
panels meet the bath or shower base.
Apply sealant to any exposed cut edges.
Install all accessories following the instructions
packed with them.
Wait 24 hours before showering or running
water.
21236601-2-F ©2017 Kohler Co.
11 12
17
22
13
18
23
16
21
14
19
15
20
24
25
27 28
26
29
30