Installation Guide

Tools and Materials
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few minutes
to review this manual before you start installation. If you encounter any
installation or performance problems, please don’t hesitate to contact us. Our
phone numbers and web site are listed on the back cover. Thanks again for
choosing Kohler Company.
Before You Begin
Please read all instructions before you begin.
Observe all local plumbing and building codes.
Before installation, unpack the new faucet and inspect it for damage. Return
the faucet to the carton until you are ready to install.
Leave the protective sleeve on the spout supply tube until the spout is
installed. The spout has an O-ring sealing surface which may be damaged if
unprotected.
Provide an access panel to the valves from under the deck.
Installer-supplied copper tubing is to be 5/8” O.D. (1/2” nominal).
Install water hammer arrestors in the supply lines near the valves.
These instructions cover two methods of installation; installation on finished
deck or rim, and installation on rough (unfinished) deck. Follow the sections
that pertain to your particular installation.
Instructions are given for installations with 8” (20.3cm) centers. For wider
installations, adjust all roughing-in dimensions and copper tubing lengths
accordingly.
Shut off the main water supply.
Kohler Co. reserves the right to make revisions in the design of faucets
without notice, as specified in the Price Book.
Adjustable
Wrench
Solder
Propane
Torch
Assorted
Screwdrivers
Pipe
Wrench
Strap
Wrench
Hacksaw or
Tubing Cutter
Plumbers
Putty
Thread
Sealant
1016271-2-A 2 Kohler Co.