Installation Guide

Installation on Finished Deck or Rim (cont.)
Slide one fiber washer, followed by one or two rubber washers, onto each
valve body.
Insert the 2–7/8” (7.3cm) long copper tubes between the valve bodies and
the 1/2” tee. Insert the 2–3/8” (6cm) long copper tube into the top of the
tee.
Do not solder the connections at this time.
NOTE: The valve body marked “Cold” must be on the right side when you
are facing the front of the faucet.
Insert the valve bodies through the mounting holes from the bottom of the
deck/rim. Match the copper tube from the tee with the spout supply tube.
Hold in place.
Place a collar with the flange side up, onto each valve body. Thread the
collar down to at least 1” (2.5cm) from the top thread on the valve body.
Tighten the mounting nuts on each valve body from underneath the
deck/rim.
Solder the copper tubes to the valve bodies, tee and spout supply tube.
Solder the hot and cold water tubes to the valve body inlets. Ensure that the
cold supply is on the right side.
Proceed to Check Operation of Valves.
Kohler Co. 5 1016271-2-A