Installation Guide
2. Install the Handles
Adjust each handle so the lever faces horizontal when closed.
To adjust the handles, remove the handle assembly. Remove and
turn the spline adapter 1/4 turn. Reinstall the spline adapter.
Reposition the handle. If the handle is not horizontal, repeat the
procedure until it is positioned properly.
Remove the handles.
Apply plumbers putty or other sealant to the back of each
escutcheon according to the putty manufacturer’s instructions.
Carefully slide the escutcheon over the handle bonnet.
Securely hand tighten the handle assembly onto the valve body.
Press the escutcheon firmly against the wall.
Remove any excess putty or sealant.
3. Complete the Installation
Turn on the water supplies and check the installation for leaks.
Repair as needed.
Lever
Valve Body
Escutcheon
Spline Adapter
Apply
plumbers
putty.
Handle
Bonnet
1023410-2-B 4 Kohler Co.