Installation & Assembly

6. Install the Adapter Dual Steam Head
Remove the adhesive backing from the steam adapter.
Mount the adapter firmly to the side of the steam generator.
NOTICE: Do not pinch, nail, wedge, or use undue force when
handling the white crossover cable. Any damage may result in
adapter failure. If the adapter is not installed immediately, protect
the cable ends with tape or other shielding material.
Connect the 10 (254 mm) silver or 16 (406 mm) white crossover
cable to the steam adapter and the inlet side of the 3-way coupler.
Connect the 10 (254 mm) black straight-through cable to the
output side of the 3-way coupler and the first generator.
Connect the 72 (1829 mm) or 78 (1981 mm) black
straight-through cable to the output side of the 3-way coupler
and the second generator.
Connect the temperature sensor wire to the corresponding port
on the steam adapter.
Connect the data cable to the steam adapter and route the cable
to the controller installation location.
10" (254 mm)
Black Straight-
Through Cable
Interface
Controller
25' (7.6 m)
Data Cable
Steam
Head
Temperature
Sensor
Control Cable
Input (Location
Varies By Model)
Steam
Head
72" (1829 mm)
or 78" (1981 mm)
Black Straight-
Through Cable
10" (254 mm) Silver or 16"
(406 mm) White Crossover Cable
3-Way Straight
Coupler
Steam Adapter
Kohler Co. 11 1235393-2-C