Installation Guide
210 319 4350
IMPORTANT ASPECTS TO CONSIDER
Koni Materials
®
ships freshly made
manufactured stone. This fresh made stone will
typically achieve 90% of its true color after
approximately 30 days of manufacturing
(based on good weather conditions). An
expected chemical reaction allows for a proper
“curing” of the color.
Should a shipment of stone be received, and
the color of the stone appears darker than
anticipated (SUCH AS GREY INSTEAD OF
WHITE) – Please be aware that the stone is
experiencing the curing process and will lighten
over the next few weeks.
NOTE: Product can be installed in its “un-cured”
state. Installation does not effect the process.
Product curing will happen naturally on-site.
For performance calculations per box, please
consult our website because in some of our
models, their contents are calculated
considering the joint.
Please visit our website
www.konimaterials.com


