2’x16’ Alexander hardtop gazebo with double roof Assembly Manual Kozyard LLC Products © Copyright 2016 - 2022 Kozyard LLC. | All Rights Reserved.
Warnings and Cautions 1.Please read and follow this assembly and operation guide to reduce personal injury and damage to your gazebo. 2.Do not discard any of the packaging until you have checked that you have all the parts 3.Tie sidewalls and nettings to the poles when it is incoming over 30 MPH wind. 4.Some parts might have sharp edges/corners.please follow basic safety precautions to reduce the risk of hurts, this item contains small parts which can be swallowed by children.
A x4 K16 x1 B6 x2 K6 x1 B61 x2 L x4 B62 x2 M1 x4 C6 x2 M2 x4 C61 x2 N1 x4 C62 x2 D8 x2 D81R x2 D81 x2 D82 x2 E8 x2 E81 x2 E81L x2 E82 x2 F x4 H1 x4 G x4 H2 x1 J1 x4 H x4 H3 x1 J2 x4 page 1 N3 x4 ITEM A B6 B61 B62 C6 C61 C62 D8 D81 D81R D82 E8 E81 E81L E82 F G H H1 H2 H3 J1 J2 K6 K16 L M1 M2 N1 N3 QTY 4 2 2 2 2 2 2 2 2 2 2 2 2 2 2 4 4 4 4 1 Double-sided adhesive tape 1 Corner Solidifyng Bar 4 4 Corner Solidifyng Bar Inside Roof Connector 1 Outside Roof Connector 1 Plate 4 Short Corner Ro
P12 x2 P2 x2 Q6 x2 Q16 x2 Q15 x2 R x8 W11 x2 W12 x2 W13 x2 W14 x2 S x136+2 T2 x2 T6 x2 W15 x2 U1 x4 ITEM P2 U2 x4 U5 x2 U3 x4 V11 x2 V63 x2 V64 x2 V x4 P12 Q6 Q15 Q16 R S T2 T6 U1 U2 U5 U3 U4 V V11 V12 V63 V64 V65 V66 W11 W12 W13 W14 W15 W16 W17 W18 U4 x6 V12 x2 V65 x2 V66 x2 page 2 W16 x2 W17 x2 W18 x2 DESCRIPTION Finishing Bar Net Frame Finishing Bar Net Frame Net Frame Finishing End Spacer Finishing Bar Finishing Bar Solidifying Bar Solidifying Bar Solidifying Bar Iron Angle Iro
6# x8+1 7# x40+2 X61 x2 X62 x2 X63 x2 X64 x2 9# x24+2 X65 x2 10# x4+1 11# x12+1 6-9*1.
Step 1: Set up poles (Part A) with stand plates (Part L) using screws 1# as shown in diagram. Parts Required: A A X4 1# 1# A x4 1# x12 L x4 1# L L Reference for anchoring gazebo: 1.If the deck is hard wood and the depth of it is over 3 inches,you can use 5/16in. x 4 in. structural wood screw to secure the gazebo. 2.If the ground is concreted and the depth of it is over 3 inches, you can buy Diameter 3/8" x3" length Sleeve anchors.
Parts Required: C6 x2 B6 x2 F x4 E8 x2 D8 x2 1# X24 Step 2: 1. Connect (Part C6) and (Part B6) into one beam using union bar (Part F) with screws 1# as shown in diagram. B6 B6 X2 C6 C6 1# F 1# 1# 1# 2.Connect (Part E8) and (Part D8) into one beam using union bar (Part F) with screws 1# as shown in diagram.
Parts Required: 1# x104 B61 x2 C61 x2 B62 x2 C62 x2 D81R x2 E81L x2 E81 x2 D81 x2 D82 x2 E82 x2 Step 3: B61 C61 C6 E81 C62 E81L E8 B6 B62 D81 D81R D8 E82 1. Connect parts (C61,C62,E81,E82,E81L) to Parts (C6 , E8) using screws 1# as shown in diagram. D82 C6,E8 X2 1# 1# C62,E82 C61,E81,E81L B6,D8 Tip: Do not tighten all screws on Jointer bar (part B61,C61,E81,D81,E81L,D81R), until the screws of the roof panels be aligned in place. 2.
Parts Required: 3# x16 2# x16 Step 4: Use screws (2# , 3#) to connect poles and beams together as shown in diagram. 2# 2# ① ① X4 C6 D8 B6 A E8 E8 A B6 A ② D8 C6 X4 ② A 3# 2+ Tip: At least two people for this step.
Parts Required: J1 x4 1# J2 x4 J1 x32 J2 1# 1# 1# X4 Step 5: Affix the frame with corner solidifying bars (Part J1,J2) using screws 1# as shown in diagram. J1 J2 J1 Diagonal 1 J2 ona l2 J2 Diag J1 J2 J1 Diagonal 1 = Diagonal 2 Tips: Please measure between posts to posts (DIAGONALLY),to assure it is squared up so that all of the pre-manufactured materials fit as planned.
Parts Required: 9# H x4 G x4 9# x24 9# G H 9# ① X4 ② Step 6: X4 2.Affix middle beams using joint 1.Finish connecting beams using corner covers (Part G) and screws 9# as shown in diagram. ① cover (Part H) and screws 9# as shown in diagram.
Parts Required: H2 x1 Step 7: 1.Please seal the seams with silicone rubber after finishing this step,it will prevent any water from leaking. 2.by the way , there are no need to seal the cap screws of the roof panel with this silicone rubber, as long as the screws (passing through spacer part S) are properly fixed on the roof panels.
Parts Required: H1 x4 4# x128 1# x4 Step 8: After finish hooks 4# into tracks, then put H1 to lock them.
Parts Required: M2 x4 12# x12 M1 x4 1# x12 Step 9: Connect the short corner roof bar (Part M1) with the corner roof bar (Part M2)using screws 1# and washer 12#. Tip: The combination will be called “Part M3” in following steps.
Parts Required: P2 x2 R x4 Q6 x2 1# x16 K6 x1 Step 10: Set up roof frame M3 M3 Q6 1# 1# ① P2 P2 K6 1# 1# Upward View Q6 M3 ③ 1.Connect the inside roof connect(Part K6) with M3 the corner roof bar (Part M3)using screws 1# M ① 1# M3 N N2 N1 M3 1# M 1# 1 1# M3 ② X2 X4 3.Attach finishing bar (Part M3) to main frame using screw 1# as shown in diagram K6 M3 P2 M3 P2 N2 2.
Parts Required: N1 x4 N3 x4 1# x24 Upward View N3 N3 hole N1 1# 1# N1 N1 1# ① 1# 1# M3 N3 1# 1# N1 N3 N3 hole ① N1 1# 1# ② N2 N3 ③ 1# N1 N3 M3 hole hole 1# 1# X2 N2 X4 Step 11: Attach roof bar (Part N1,N3) to main frame using screw 1#. ③ ③ ② N1 N3 N1 N3 N1 ② N1 N3 ③ N3 ② ③ 2+ page 14 Tip: At least two people for this step.
Parts Required: 1# x3 K16 x1 1# 1# 1# K6 K16 Step 12:Connect outside roof connctor (Part K16)to inside roof (Part K6)using screw 1# as shown in diagram.
Parts Required: H3 x1 V11 V63 V12 V64 V65 V66 Step 13: Snap brackets (Part Z,Z1,Z2) to roof panel edges as shown in diagram. (with snaps facing upwards) X2 Z V11 V12 V64 V63 V V65 V V66 Tips: 1. Wearing protective gloves is recommended. 2.Please stick H3 (double-sided adhesive tape) to the down side edge of the roof panels where the brackets (part Z, Z1,Z2) are supposed to attached in order to avoid these plastic brackets from sliding off prior to assembly.
Parts Required: T2 x2 V 66 R T6 T6 V V 65 1# R x4 V x12 V 64 V 63 R V12 T2 V 11 T2 1# V 11 V12 R R 1# V63 V64 V V 1# 1# T6 V65 V 66 1# X2 Step 14: 1.Push the roof panels (PartV11,V12,V63,V64,V,V,V65,V66) to upper roof as shown in diagram. 2.Attach finishing bar (Part T2,T6)to upper roof with finish end (Part R) using screws 1#as shown in diagram.
Parts Required: U2 x4 U1 x4 U3 x4 U5 x2 ② U4 x6 U1 U2 1# x32 ② ③ U5 U1 ② U2 U2 U5 ① U1 ① ② ② U1 ③ U2 ② ① Attention: If the holes on Solidifying Bar (part U1, U2, U5) and the hole of the roof panel cannot be aligned, please adjust or loose screw 1#, until the screws of the roof panel in place. X2 U5 Step 15: Attach solidifying bars ( Part U1,U2,U5) to roof bar or corner roof bar using iron angle (Part U3, U4) and screws 1# as shown in diagram.
Parts Required: x32 H3 x1 W11 x2 W12 x2 W13 x2 W14 x2 W15 x2 W16 x2 W17 x2 W18 x2 Step 16: Snap brackets (Part Z) to roof panel edges as shown in diagram. (with snaps facing upwards) Z X2 Z Z Z Z Z Z Z Z W11 W12 W13 W14 Tips: 1. Wearing protective gloves is recommended. 2. Please stick H3 (double-sided adhesive tape) to the Z down side edge of the roof panels where the brackets (part Z) are supposed to attached in order to avoid these plastic brackets from sliding off prior to assembly.
Z x28 Parts Required: Z3 x4 X61 x2 X62 x2 X63 x2 X64 x2 X65 x2 X66 x2 X67 x2 X68 x2 X69 x2 Z4 x4 X70 x2 H3 x1 Step 17: Snap brackets (Part Z,Z3,Z4) to roof panel edges as shown in diagram. (with snaps facing upwards) X2 Z3 Z Z Z Z Z Z Z Z Z4 X64 X63 X62 X61 Z4 X65 Z Z Z Z Z Z Z Z3 X66 X67 X68 X69 X70 Tips: 1. Wearing protective gloves is recommended. 2.
Overall roof assembly: X62 N1 X64 X61 X63 W 18 W 17 N1 Please put the panels on the frame and assemble them from the centerline (Part N1) to the left and right. W16 W15 X65 X 66 X 67 W 14 W13 W 12 X 68 X70 W11 X69 W11 W 12 W13 W14 N1 W 15 W16 W17 W18 X61 X62 X63 X64 X65 X66 68 X67 X X69 X70 N1 Connect roof as below: Tip: Wearing protective gloves is recommended.
Parts Required: S x136 L 28mm 5# x84 L 45mm 6# x8 L 50mm Step 18: 10# x4 L 25mm 6# Affix roof panels using screws and spacers (Part S) as shown in diagram. 10# 7# x40 ATTENTION – VERY IMPORTANT! S ① X4 ① Align all roof panels and screw LOOSELY (DO NOT TIGHTEN ANY SCREWS until all roof panels of one side are aligned accordingly), And then TIGHTEN ALL screws to lock the roof panels in place.
Parts Required: N3 N1 Q15 1# x8 Q16 x2 Q15 x2 P12 11# x12 N3 Q16 Upward View N1 N1 P12 P12 N3 N1 Q16 N3 Q15 Step 19: Attach net frames (Part P12,Q15,Q16) to finishing bars(Part P2 , Q6) using screws (1#,11#) as shown in diagram. N3 11# Q16 1# 11# N1 N3 Q15 1# N1 1# 11# 11# 1# 11# P12 Q15 Perspective: 11# P12 N1 Q16 Q16 N3 P12 N1 Q15 N1 N3 Tip: The perspective drawing is for demonstrating how to assemble final step that set up Parts (P12,Q15,Q16) better.
Parts Required: S5 x2 Y5 x2 S6 x2 S5 Y5 Y6 Step 20: Hang up mosquito sidewalls and solid sidewalls as shown in diagram.
Parts Required: SY X4 Step 21: When you close the curtain,please refer to below steps to fix with poles as shown in diagram. ① S1,S2 ⑤ ③ ④ Y1,Y2 ② SY S1,S2 S1,S2 Y1,Y2 S1,S2 Y1,Y2 S1,S2 Y1,Y2 Care and Warranty 1.Wash frame parts and fabric with mild soap and water,rinse thoroughly. do not use bleach,acid, or other solvents on the fabric or frame parts. 2.Frame,Bolts,Nuts are warranted to be free from defects in material and workmanship for 1 year from item purchased.
Thank you for your purchase of KOZYARD’s gazebo. As a professional hardtop gazebo manufactor, kozyard always serves you for parts and replacement even your warranty expired. 66 Kozyard LLC Warehouse in West: 10808 6th ST, Unit 100,Rancho Cucamonga, CA 91730 Warehouse in East: 100 Ethel Rd W, Piscataway, NJ 08854 © Copyright 2016 - 2023 Kozyard LLC. | All Rights Reserved.