User Manual

Installation and operating instructions BM 70 A/P Page: 30 11/00
7.3 Replacement of the signal converter
Always disconnect from power source before commencing work!
Hazardous-duty systems
Before replacing the signal converter (instrument "head") in the hazardous location, make absolutely
certain that there is no explosion hazard (gas-free certificate). Allow the prescribed waiting time of 22
minutes to elapse before opening the housing!
1. Remove safety lock (see Sect. 9.3) with machinist's wrench, size 4 mm, and unscrew cover from
the terminal box with the special wrench. If a sunshade is fitted, remove this first (see Section
6.1.9).
2. Disconnect all cables from the terminals in the terminal compartment, see Section 7.8.
3. Remove the 4 Allen screws M (Allen key size 5 mm) and lift off the signal converter. The flange
unit (incl. waveguide window) will remain tight, also on pressurized tanks.
Caution
On pressurized tanks, do not on any account remove the 4 screws H connecting the waveguide
window to the BM 70 A/P flange! DANGER TO LIFE!
4. Install the new BM 70 A/P signal converter.
5. Check power voltage and fuse(s) (refer to instrument nameplate) and change or replace if neces-
sary, see Sect. 9.2 and 9.3.
6. Reconnect all cables in the terminal compartment as described in Sect. 7.8.
7. Check against the attached report on settings whether the factory-set parameters are correct for
your application. If not, reset the parameters as described in Sect. 8.
8. Subsequently, record the empty-tank spectrum, see Sect. 8.6.12.
Important:
Ensure that the screw thread of the covers on the terminal and electronic compartments is well
greased at all times.
7.4 Field assembly
When the BM 70 A/P needs to be field assembled, all
required parts are included with the supply (stud bolts,
washers, etc.).
If supplied loose, bolt the waveguide window (flange
assembly) or the distance piece to the BM 70 A/P.
Tightening torque for the 4 Allen screws M (key size SW 5
mm): max. 8 Nm ~ 0,8 kpm.
Note: The upper Teflon plug must be absolutely dry and
clean! Moisture and dirt will negatively affect functionability
of the BM 70 A/P!
Bolt antenna and antenna extension together: torque for the
3 stud bolts: max. 8 Nm ~ 0.8 kpm.
Do not on any account detach screws H!
distance piece (for
high-temperature version
up to 250°C (482 °F)
upper Teflon plug
O-ring
lower Teflon plug
O-ring
BM70 A
connecting flange
antenna extension
antenna
M
H
M
signal converter