Manual

4 ELECTRICAL CONNECTIONS
30
ALTOSONIC V12
www.krohne.com 04/2013 - 4002643502 - MA ALTOSONIC V12 R02 en
4.7 Grounding
There are two screw connection points (one M5 thread and one M4 thread) to attach a ground
conductor. They can be used to connect the upstream and downstream piping to the flowmeter
(Equipotential).
Figure 4-7: Location of grounding connectors