User Manual

3
INSTALLATION
34
OPTIWAVE 7400-24 C
www.krohne.com 12/2015 - 4003518001 - MA OPTIWAVE7400-24-R01-en
Bypass chambers
Installation next to tanks containing one liquid and foam
The top process connection of the bypass chamber must be above the maximum level of
liquid.
The bottom process connection of the bypass chamber must be below the lowest measured
level of liquid.
Installation next to tanks containing more than one liquid
The top process connection of the bypass chamber must be above the maximum level of
liquid.
The bottom process connection of the bypass chamber must be below the lowest measured
level of liquid.
Additional process connections are necessary for the liquids to circulate freely along the
length of the bypass chamber.
CAUTION!
If the device is installed in horizontal cylindrical tank that contains a high dielectric constant
liquid without a stilling well, do not put it on the tank centerline. This will cause multiple
reflections and the device will not measure accurately. Use the 2.5.8 Multiple Reflections
2.5.8 Multiple Reflections2.5.8 Multiple Reflections
2.5.8 Multiple Reflections
function in Supervisor > Application
Supervisor > ApplicationSupervisor > Application
Supervisor > Application to keep the effects of multiple reflections to a minimum. For
more data,<Function Description> (2. Supervisor).
Figure 3-15: Installation recommendations for bypass chambers that contain more than one liquid
1 Bypass chamber
2 Additional process connection