Installation Instructions

81700-82100'82400 WSM,11770
-------
-
-------
3
TRANSMISSION
Check and High Relief Pressure
A CAUTION
When checking, park
the
tractor
on
flat
ground,
apply
the
parking brake.
1.
Remove
the
8 mm
(0.31
in.) hex socket head plug
from
P1
(1)
or
P2
(2)
port
(P1
is
for
forward
and
P2
is
for
reverse).
2.
Assemble the
HST
adaptor
A and threaded
joint
with
the
gasket between them.
3.
Install
the
assembled
HST
adaptor
A and threaded
joint
to
P1
(forward) (1) or
P2
(reverse) (2) port.
4.
Install
the
cable threaded
joint
in relief valve set pressure
tester and high pressure gauge
to
threaded
joint
in order.
5.
Run
the
engine
at
2600 rpm.
6.
Place
the
high-low
shift lever in high.
7.
Depress the speed control pedal approx.
10
mm (0.39 in.)
which rotates
the
trunnion
shaft 0.087 rad (5.0°).
Check and High relief 21.6
MPa
pressure (Oil
temperature
Factory
spec.
220 kgf/cm
2
at
50°(,
122°F)
3129
psi
IMPORTANT
Measure
quickly
so
that
the
relief
valve
may
not
be in
operation more than
10
seconds.
NOTE
High pressure gauge
is
30
MPa
(300 kgf/cm
2
,
4260
psi)
full
scale.
(When reassembling)
Install
the
8 mm
(0.31
in.) hex. socket head plug
to
the
port
with
O-ring.
40.70
to
94.93 N·m
Tightening
torque
Plug
(P1,
P2
port)
4.15
to
9.68
kgf'm
30.02
to
70.02 ft-Ibs
(1)
P1
Port (Forward)
(2)
P2
Port (Reverse)
3-S9
(3)
P3
Port (Charge)