Installation Instructions
81700ยท82100'82400 WSM,11770
9
ELECTRICAL
SYSTEM
[3] ENGINE KEY SWITCH SHUT-OFF SYSTEM
CHECKING
Terminal3 (white) - Terminal2
Approx. 0.4 ohms
(black)
Resistance
Terminal 1 (red)
- Terminal2
Approx.
1.5
ohms
(black)
3)
Fuel
Cut
Off
Solenoid Resistance
1.
Disconnect the connector
of
fuel
cut-off
solenoid.
2.
Measure
the
resistances
with
an
ohmmeter
across
the
terminal 3 (white) and terminal 2 (black),
across
the terminal
1 (red) and terminal 2 (black).
3.
If
the resistances are 0 ohm or infinity, fuel
cut-off
solenoid
is
faulty.
Fuel
Cut
Off
Solenoid
1)
Lead
Terminal Voltage
1.
Disconnect the connector
of
fuel
cut-off
solenoid.
2.
Turn the main switch
"ON".
3.
Measure the voltage
with
voltmeter
across
the
terminal
3
(red, black)
ofthe
wiring
harness
side and the
chassis.
4.
If
the battery voltage
(11
to
14
V)
is
not
indicated, the fuse,
the main switch or
wiring
harness
are faulty.
Approx.
battery
voltage
Terminal3 (red, black)
-
chassis
Voltage
2)
Fuel
Cut
Off
Solenoid Test
1.
Disconnect the lead
from
the
fuel cut
off
solenoid
after
turning
the main switch off.
2.
Connect jumper leads from the battery positive terminal
to
the fuel cut
off
solenoid
terminal
1 (red), and
from
the
battery
negative
terminal
to
the
fuel
cut
off
solenoid
terminal 2 (black).
3.
If
the solenoid plunger
is
not
attracted,
the
fuel cut
off
solenoid
is
faulty.
9-513










