Operation Manual

BX25. RCK54(P)-23BX. RCK60B-23BX. LA240. BT601. WSM
FRONT
AXLE
(A)
t
(e)
(8)
(1
)
4.
CHECKING, DISASSEMBLING AND SERVICING
[1] CHECKING AND ADJUSTING
Toe-in
1.
Inflate the tires to the specified pressure.
2. Turn the front wheels straight ahead.
3.
Measure the toe-in ((B)-(A».
4.
If the measurement is not within the factory specifications, adjust
the tie-rod length.
oto 5 mm
Toe-in «B)-(A»)
Factory spec.
oto 0.19
in
.
Adjusting
procedure
1.
Loosen the lock nuts and turn the tie-rod to adjust the rod length
until the proper toe-in measurement is obtained.
2. Retighten the lock nuts.
(1) Tie-rod (A) Wheel
to
Wheel Distance
at
Front
(2) Lock Nut
(B) Wheel
to
Wheel Distance
at
Rear
(C) Front
W1011333
Front
Axle Rocking Force
1.
Jack up the front side
of
tractor and remove the front wheels.
2.
Set a spring balance to the front gear case cover.
3.
Measure the front axle rocking force.
4.
If
the measurement is not within the factory specifications, adjust
as following .
Adjusting
procedure
1.
Remove the cotter pin (1).
2.
Tighten
or
loosen the adjusting nut (2) so that the measurement
of rocking force comes to factory specifications.
3.
If the slot and pin hole do not meet, align the nut until they do
meet within factory specifications.
4. Install the new cotter pin.
(When reassembling)
Be sure to split the cotter pin like
an
anchor.
(Reference)
Tightening torque of adjusting nut:
19.6
N'm
(2.0 kgf·m, 14.5 ft-Ibs)
49.0 to 177.7 N
Front axle rocking force
Factory spec.
5.0 to 12.0 kgf
11.0 to 26.5 Ibs
(1) Cotter Pin
(2) Adjusting Nut
W1011602
3-S4