Operation Manual

BX25, RCK54(P)-23BX, RCK60B-23BX, LA240, BT601, WSM
FRONT LOADER
Floating
3TAAAAGLP020A
(1) Boom Control Section
(5) Detent Mechanism
A1
:
A1
Port
P : P
Port
(From Pump)
(2) Bucket Control Section
(6) Neutral Passage 1
B1
:
B1
Port
T:
T
Port
(To tank)
(3) Spool
(7) Boom Cylinder
P.B.
:P.B.
Port
(To 3 Hitch)
(4)
P.B.
Passage 1
a :
Low
Pressure
1.
When the hydraulic control lever is set to the
"FLOAT"
position, the spool (3) moves further to the right from the
"DOWN"
position and is retained by the detent mechanism (5).
2.
This forms oil passages among the
A1
port,
B1
port and T port. As a result, oil in the boom cylinder (7) flows freely
from the
A1
port and
B1
port through the T port to the transmission case.
3.
Oil entering the P port flows to the bucket control section (2) through the neutral passage 1 (6) and P.B. passage
1 (4).
8-M6