Operation Manual
B><25,
RCK54(P)-23BX, RCK60B-23BX, LA240,
BT601,
WSM
FRONT LOADER
•
Dump
1
(4)
3TAAAAGLP022A
( 1
P T
T
_:b
(1) Boom Control Section (6) P.B. Passage 2
P : P
Port
(From
Pump)
A2
:A2
Port
(2) Bucket Control Section
(7) Load
Check Valve
T:
T
Port
(To Tank) (To
Bucket
Cylinder)
(3) P.B. Passage 1
(8) Passage 2
P.B. :P.B.
Port
(To 3
Hitch)
B2:
B2
Port
(4) Spool (9) Bucket Cylinder
(From
Bucket
Cylinder)
(5) Neutral Passage 2
b :
High
Pressure
1.
When the hydraulic control lever is set to the
"DUMP
1"
position, the spool (4), which forms oil passages among
passage 2 (8),
A2
port and B2 port.
2.
The pressure-fed oil from the P port flows through the boom control valve, opens the load check valve, and flows
to the bucket cylinder to extend the cylinder through the notched section
of
the spool and A2 port.
3.
Return oil from the bucket cylinder (9) flows from the B2 port to the passage 2 (8), and flows to the A2 port together
with the pressure-fed oil from the P port.
As a result, the dump speed is increased.
(Reference)
• The
oil pressure
of
the A2 port and
B2
port is identical, but the bucket cylinder extends by the difference
of
received
pressure area (cylinder rod part).
8-M8