Operation Manual

BX25,
RCK54(P)-23BX, RCK60B-23BX,
LA240,
BT601,
WSM
BACKHOE
Stabilizer
RH
(Extend)
(1
)
¢'=
...
_
.....
3TAAAAGNP014A
P.B.
(6)
(1) Stabilizer Cylinder
RH
(5) Spool
P:
Pump Port
A3:
A3
Port
(2) Stabilizer RH Control Valve (6) Inlet Section
T:
Tank Port
(To
Stabilizer
RH
Cylinder)
(3) Bridge Passage
(7) Outlet Section
P.B.
:Power Beyond Port
B3:
B3 Port
(4) Load Check Valve
(From Stabilizer
RH
Cylinder)
a:
Low
Pressure
b:
High Pressure
1.
When the right stabilizer control lever is pulled to the downward to set to the
"EXTEND"
position, the spool (5) of
the stabilizer
RH
control valve (2) moves to the right, which forms oil passage between bridge passage (6) and A3
port, and between
83
port and T
port_
2.
The pressure-fed oil from the P port opens the load check valve (3), and flows to A3 port to extend the right
stabilizer cylinder.
3.
Return oil from the right stabilizer cylinder returns to the transmission case through the
83
port, low pressure
passage and T port.
9-M9