Operation Manual

BX25, RCK54(P)-23BX, RCK60B-23BX, LA240, BT601, WSM
BACKHOE
A
(2)
(3)
[When
the
actuator
port
pressure
is
higher
than
the
setting]
When the cylinder port HP has reached the set
pressure
of
the piston spring (5), the pressure oil
in
the
spring chamber A opens the pilot poppet (4) and flows
through the drain passage into the tank passage. This
lowers the pressure
in
the spring chamber A, and the
pressure difference across the throttle
a moves the relief
valve poppet
(1) to the right. Now the seat of the relief
valve poppet
(1) gets open. The pressure oil flows then
from this seat into the tank, and the circuit pressure is
(5) (4)
kept at the pressure level set by the overload relief valve.
3UBAAABNP020A
Relief valve setting pressure
17.20 to 17.69 MPa
Dipperstick 175 to 180
kgf/cm
2
2489
to
2560 psi
13.7 to 14.1 MPa
Swing 140 to 145
kgf/cm
2
1991
to
2062 psi
Oil temperature: 45
to
55°C
113
to
131°F
(1) Piston Poppet HP :High Pressure
(2) Pilot Poppet
lP
:low
Pressure
(3) Piston Spring
A:
Chamber
(4) Adjusting Screw
a:
Throttle
(5) Relief Valve Poppet
W1024163
Anti-cavitation
Operation
This valve,
in
operation, prevents a condition - so
called cavitation - that arises in the cylinder port
HP
(1
) (2)
where fluid is not entirely filling out.
That
is,
this relief valve is combined an anti-cavitation
functions supplying oil.
The pressure
oil at the tank port
LH
opens the check
valve poppet, allowing oil to flow through the tank port to
prevent negative pressure from being generated
in
the
cylinder.
(1) Check Valve Poppet
(4) Relief Valve Poppet
(2) Piston Spring
(5) Piston Poppet
(3) Pilot Poppet
W1024467
(5) (4) (3)
3UBAAABNP021 A
9-M17